# Pause scheduled QA runs without losing the schedule

Pause a schedule during an outage or while replacing a test target. The stored time and weekday let you resume the same cadence later.

## Pause and resume occurrences

Edit the setup, open **Schedule** and turn on **Paused**. Save the change and check the schedule on the setup page.

When the target is ready, edit the schedule again, turn off **Paused** and save. Check **Next occurrence**. To end a run already in progress, use the stop action on that run.