---
title: "Learning center | Proofline"
description: "Practical guides to production failures: databases during rollouts, container startup, stale checks and choosing a code reviewer."
url: https://proofline.sh/learn/
---

# Learning center

Practical guides to production failures: databases during rollouts, container startup, stale checks and choosing a code reviewer.

1.  ## [Lower code review costs and catch deployment risks with Proofline](/learn/reduce-ai-code-review-costs/)
    
    Keep more of your review budget for useful checks and more of your engineering time for shipping. Proofline combines code review without a subscription on its BYOK plan, model choice without a token surcharge, and checks against your target environment.
    
    Deployment failures The Proofline team November 16, 2026 4 min read
    
2.  ## [AI code review tools: compare context, controls and cost](/learn/ai-code-review-tools/)
    
    Compare AI code review tools by context, controls, findings and cost. Evaluate Proofline, Copilot, CodeRabbit, Greptile and Qodo on your own PRs.
    
    Code review The Proofline team November 15, 2026 6 min read
    
3.  ## [Fix ECS secret startup errors](/learn/ecs-secrets-startup-errors/)
    
    Fix ECS ResourceInitializationError during secret injection by checking the failed task's revision, execution role, secret reference and network path.
    
    Missing secrets The Proofline team November 15, 2026 6 min read
    
4.  ## [What NOT VALID means for PostgreSQL CHECK constraints](/learn/postgres-not-valid-constraints/)
    
    Adding a PostgreSQL CHECK constraint with NOT VALID skips the initial scan of existing rows, but immediately enforces the check against new inserts and any update to an existing row.
    
    Breaking migrations The Proofline team November 6, 2026 7 min read
    
5.  ## [How rolling deployments change your PostgreSQL connection budget](/learn/connection-limits/)
    
    A rolling deployment can exhaust PostgreSQL connections even when the running service fits. The connection budget must account for old and new tasks overlapping.
    
    Capacity overruns The Proofline team November 5, 2026 8 min read
    
6.  ## [How to stop relying on stale deployment checks](/learn/production-evidence-freshness/)
    
    A deployment check can stay green after the environment it verified has changed. In a small local experiment, a cached check returned PASS while the same HTTP request that succeeded moments earlier failed with 403 Forbidden. Refreshing the evidence updated the check result to BLOCK.
    
    Deployment failures The Proofline team November 4, 2026 4 min read
    
7.  ## [Container image review](/learn/container-image-review/)
    
    A container image can build successfully and still fail on its deployment target. Review both the image's supported platforms and the runtime configuration, then follow the image by digest from the build to the running service.
    
    Broken dependencies The Proofline team October 7, 2026 2 min read
    
8.  ## [PostgreSQL migration review for rolling deployments](/learn/database-migration-review/)
    
    A PostgreSQL migration must work with the application versions still running during a rolling deployment. Review the schema change, old and new readers and writers, backfill and rollback together. This worked example uses an expand-and-contract column rename to show what to check at each release.
    
    Breaking migrations The Proofline team October 7, 2026 6 min read
