Set a repository’s codebase build credit limit

A generated codebase build consumes credits. Adjust its limit when you want to bound the work a future build can do without changing a revision scan’s budget.

Ask your connected agent#

Show this repository’s codebase page refresh settings and credit limit. Propose my new limit while keeping the refresh behavior unchanged.

Check the repository and credit units, then read back both settings. Saving a limit does not itself publish a new set of codebase pages. Inspect the next build for its actual spend.

Search help

Tab to a result. Enter to open. Escape to close.